LogoLedger
Live Cost Estimator

Built for the
yard floor,
not the office.

Drag the sliders. See exactly what Ledger saves your operation — before you sign up for anything.

85
10500
3
120
$480
$0$2,000
LEDGER v3.2.1
2x6x16 PT — 24 pcs$187.20
Hilti TE 60 — 3-day$135.00
3/4" OSB 4x8 — 12 shts$264.00
Framing Nails 3.5" 5lb$42.50
SPLIT 3 CONTRACTORS$628.70
CHARGE

Annual Savings

$7,601

vs. current stack

Hrs Recovered / Yr

388 hrs

at checkout

Shrinkage Reduction

$3,060

inventory delta

Checkout

Ring it up. Split it three ways.
Before the truck backs in.

REGISTER 2 — YARD COUNTER
06:01 PM
2X6X16-PT2x6x16 Pressure Treated
Martinez×24 pc$187.20
OSB-34-483/4" OSB 4x8 Sheet
Martinez×12 sht$264.00
SDS-3.5-5LBFraming Nails 3.5" 5lb
Okonkwo×3 box$42.51
LVL-18-16LVL Beam 1.75x9.5x16
Okonkwo×2 pc$179.00
TYVEK-9X100Tyvek HomeWrap 9x100
Reyes×1 roll$148.00
5 items

TOTAL

$820.71

Split Invoice

3 Contractors
Martinez Framing$451.20
Okonkwo Builds$221.51
Reyes Drywall$148.00
Send separate invoices

Today at This Register

Transactions
47
Avg. Checkout Time
1m 12s
Revenue
$12,840
Split Invoices
9

PO #4471 — Ready to Reconcile

Okonkwo Builds framing PO matches today's line items. Concrete truck scheduled Tuesday 6am.

Inventory

Every SKU. Every count.
No clipboard required.

3

In Stock

2

Low Stock

2

Reorder Now

SKU
Description
On Hand
Stock Level
Cost
Sell
Margin
Status
2X4X8-KD
2x4x8 KD StudLumber
840pc
$3.20
$5.49
42%
2X6X16-PT
2x6x16 Pressure TreatedLumber
68pc
$6.10
$7.80
22%
!
2X10X20-DF
2x10x20 Doug FirLumber
12pc
$18.40
$26.50
31%
!!
OSB-34-48
3/4" OSB 4x8Sheet Goods
145sht
$16.80
$22.00
24%
CDX-12-48
1/2" CDX Plywood 4x8Sheet Goods
34sht
$28.50
$38.75
26%
!
SDS-3.5-5LB
Framing Nails 3.5" 5lbFasteners
210box
$9.40
$14.17
34%
HNGR-LUS210
Joist Hanger LUS210Hardware
18bag
$11.20
$16.99
34%
!!

2 SKUs need reorder before Tuesday

2x10x20 DF and LUS210 hangers are below framing schedule requirements

Accounts

POs reconciled before
the concrete arrives.

Match purchase orders to framing schedules. Flag overbills. Send split invoices to three contractors in one tap.

Open PO Balance

$19,900

across 4 contractors

Charged Against This PO

2X6X16-PT2x6x16 PT — 24 pcs
$187.20
OSB-34-483/4" OSB — 12 sheets
$264.00
SDS-3.5-5LBFraming Nails 3.5" — 3 boxes
$42.50
LVL-18-16LVL Beam 1.75x9.5 — 2 pcs
$179.00

Remaining on PO

$2349.25

Rentals

Hilti TE 60 — 3-day.
Checked out in 8 seconds.

Day-rate logic, due-back tracking, and damage deposits — all from the same counter as your lumber sales.

3

On Rent

2

Available

Hilti TE 60 Rotary Hammer

HILTI-TE60

On Rent
Martinez FramingDue 02/26/2026Day 3 of rental

$45/day

$175/wk

Hilti TE 60 Rotary Hammer

HILTI-TE60-B

Available

$45/day

$175/wk

Skilsaw 7-1/4" Circular Saw

CIRC-7-14-SKILL

On Rent
Okonkwo BuildsDue 02/25/2026Day 1 of rental

$28/day

$98/wk

Skilsaw 7-1/4" Circular Saw

CIRC-7-14-SKILL-B

Maintenance

$28/day

$98/wk

Bobcat S550 Compact Loader

COMPACT-LOADER

Available

$380/day

$1400/wk

Wacker Plate Compactor

PLATE-COMPACT

On Rent
Callahan ConcreteDue 02/24/2026Day 2 of rental

$75/day

$260/wk

Quick Rent Calculator

Hilti TE 60 Rotary Hammer

HILTI-TE60

3d
1 day2 weeks
3 days @ $45/day$135.00
Damage deposit$225.00
Total Due Now$360.00

Overdue Today

Wacker Plate Compactor (Callahan Concrete) was due back this morning. Auto-charge applied.

Reporting

Numbers that mean something
before you open the doors.

Total Revenue

$52.3k

+12.4% vs prior period

Transactions

284

+8.2% vs prior period

Avg Checkout

1m 08s

-18s vs prior period

Rental Utilization

74%

+6pp vs prior period

Revenue by Category

LumberRentalsHardware

Avg Checkout Time

Seconds per transaction by hour

Top Revenue SKUs — This Week

12X4X8-KD2x4x8 KD Stud$4,218767 units
2OSB-34-483/4" OSB 4x8$3,190145 units
32X6X16-PT2x6x16 PT$2,683344 units
4HILTI-TE60Hilti TE 60 Rental$1,89042 units
5SDS-3.5-5LBFraming Nails 5lb$1,420100 units

From the Yard

Operators who switched.
What they actually said.

3 hrs → 20 min

Weekly reconciliation

We run three registers and a rental counter out of the same yard. Before Ledger, I had two systems that never agreed. Now Tuesday morning reconciliation takes 20 minutes instead of three hours.

Tom Hendricks, Owner, Hendricks Building Supply

Tom Hendricks

Owner, Hendricks Building Supply

Boise, ID

0 hand-written tickets

Since switching

The split invoice feature alone was worth switching. I used to hand-write three separate tickets for every multi-contractor job. Now I charge once, it splits automatically, and everyone gets their own PDF.

Denise Morales, Operations Manager, Pacific Rim Supply Co.

Denise Morales

Operations Manager, Pacific Rim Supply Co.

Tacoma, WA

8 sec

Avg rental checkout

My yard guys have dusty hands and zero patience for slow software. Ledger scans a SKU, shows the price, done. The mobile mode on the job-site trailer has been a game changer for our rental counter.

Marcus Webb, Owner-Operator, Webb Hardware & Rental

Marcus Webb

Owner-Operator, Webb Hardware & Rental

Spokane, WA

1,200+

Yards & Hardware Stores

$840M+

Transactions Processed

4.9 / 5

Operator Satisfaction

14 min

Avg Onboarding Time

Get Started

Your first register is free.
No credit card. No sales call.

Set up in under 10 minutes. Import your SKUs from a CSV or start fresh with construction-ready defaults.

No credit card required · Cancel anytime · SOC 2 Type II compliant

SOC 2 Type II

Certified

Setup in 10 min

No IT required

Real support

Humans, not bots